System Integration / Update – BAS – Case Study

Scenario Environment: Factory Customer wants to update and calibrate all controls throughout building with updated graphics package. Work has to be done during day and cannot disturb process of goods. System must be maintained while being upgraded. On-Site Inspection Three … Continue reading

Posted in HVAC | Tagged , , , | Leave a comment

BAS and Why You Should Have It

BAS in short stands for Building Automated Systems. It makes smart buildings smarter by integrating multiple devices to be controlled by a common interface that can log and excel what the building needs to be the most efficient system to … Continue reading

Posted in HVAC | Tagged , , , , , , , , , | Leave a comment

Irrigation – BAS – Case Study

Scenario Environment: School Campus Customer wants to replace control logic on water sprinklers with total on-fly schedules and controls. Cannot disturb existing fields to add communication wires. May install external antenna on site of main building. On-Site Inspection Of all … Continue reading

Posted in HVAC | Tagged , , | Leave a comment

Cooling Plant – Hvac – Case Study

Scenario Environment: Commercial Pumps always dead heading causing multiple replacements on pumps. Multiple chillers and huge ice bank not enough to cool down building. Customer wants to review and modify current Sequence of operations to improve and make more efficient. … Continue reading

Posted in HVAC | Tagged , , | Leave a comment

Power Savings – BAS – Case Study

Scenario Environment: Retail with multiple floors and zones. Customer thinks their system is wasting too much power (BAS system). Customer complains the external lights are schedule with no control internally. Customer thinks a new BAS could fix their problems. Current … Continue reading

Posted in HVAC | Tagged , , | Leave a comment

Lighting – BAS – Case Study

Scenario Retail Environment with multiple floors. Customer has multiple zones for Lighting that are currently controlled by BAS. Currently customer has too many schedules to cope with and has to edit every lighting point individually costing too many hrs spent … Continue reading

Posted in HVAC | Tagged , , | Leave a comment

Load Shead – HVAC – Case Study

Scenario Factory / Manufacturing Environment. 63x Air Condition Units with 2 Stage Gas Heating and 2 Stage DX Cooling. Customer wants to cut energy use by 10% annually and thinks the AC Units are wasting too much cooling energy. On-Site … Continue reading

Posted in HVAC | Tagged , , , | Leave a comment