Apple Apple TV Backup Banking Buffering Building Automation Cameras Case studies Email Emails Facebook Foolish People Freedom to Publish Google HVAC iPad iPad2 iPhone jailbreak Microsoft Mobile Devices NAS New Projects New Site Projects Radar Review Robots rooting Secure Security Site Configuration Site Design Site Down social media SSD Tablets Text MSG Updates VPN Web Hosting Web Page Web Site Web Sites Web UpdatesFamous Quotes
The major difference between a thing that might go wrong and a thing that cannot possibly go wrong is that when a thing that cannot possibly go wrong goes wrong it usually turns out to be impossible to get at and repair.
— Douglas Adams
Tag Archives: BAS
Raspberry Pi Weather Station w/LCD Display – Project – Case Study

Scenario Environment: Personal / Commercial / Industrial Customer wants to have up to date weather data for their area that can be logged / trended for later retrieval. Optional Internal Temperature Reading for Trending Status. Ability to control an external … Continue reading
System Integration / Update – BAS – Case Study

Scenario Environment: Factory Customer wants to update and calibrate all controls throughout building with updated graphics package. Work has to be done during day and cannot disturb process of goods. System must be maintained while being upgraded. On-Site Inspection Three … Continue reading
BAS and Why You Should Have It

BAS in short stands for Building Automated Systems. It makes smart buildings smarter by integrating multiple devices to be controlled by a common interface that can log and excel what the building needs to be the most efficient system to … Continue reading
Posted in HVAC
Tagged BAS, cooling systems, door systems, fire systems, heating systems, HVAC, lighting systems, security systems, VAV systems, video systems
Leave a comment
Irrigation – BAS – Case Study

Scenario Environment: School Campus Customer wants to replace control logic on water sprinklers with total on-fly schedules and controls. Cannot disturb existing fields to add communication wires. May install external antenna on site of main building. On-Site Inspection Of all … Continue reading
Cooling Plant – Hvac – Case Study

Scenario Environment: Commercial Pumps always dead heading causing multiple replacements on pumps. Multiple chillers and huge ice bank not enough to cool down building. Customer wants to review and modify current Sequence of operations to improve and make more efficient. … Continue reading
Power Savings – BAS – Case Study

Scenario Environment: Retail with multiple floors and zones. Customer thinks their system is wasting too much power (BAS system). Customer complains the external lights are schedule with no control internally. Customer thinks a new BAS could fix their problems. Current … Continue reading